24 NCAC 06A .0402         Revisions to Internal Controls

(a)  A proposed revision to a portion of an Internal Control shall be submitted to the Director for approval. If within 30 Days the Director has not approved, denied, or otherwise provided written notice of an action taken to the proposed revision, an Operator may implement the proposed revised Internal Controls as submitted; in such circumstances, the Commission and Director retain authority to require further revision or to deny the proposed revision, and such delay shall not constitute waiver or estoppel.

(b)  The Director may, in writing, approve, deny, or require additional modifications to any revision to the Internal Controls. If the Operator is notified of a required modification, the Operator shall address the modification within 15 Days, unless otherwise required by the Director.

(c)  If the Director requests additional information, clarification, or modification of a revision to the Internal Controls and the Operator fails to satisfy the request within 15 Days after the request, the Commission shall consider the proposed revision denied and it cannot be implemented or, if previously implemented, the Operator has 15 Days to stop implementation of that revision. If the Operator subsequently wants to pursue the revision, it shall resubmit the request along with the additional information previously requested by the Director. Nothing in this Chapter shall be interpreted to limit an Operator's use of technology. If the Operator intends to use new technology not identified in its initial proposal, it shall submit the proposed changes to its Internal Controls to incorporate the use of new technology for review.

 

History Note:        Authority G.S. 18C-114(a)(14);

Previously adopted as Rule 1D-002;

Eff. January 8, 2024;